We were required to remove a concrete staircase, landing and surrounding walls using a brokk 180 with cruncher attachment in Oxford Street, London. Work was carried out using minimal noise as there where occupied flats 2 floors above.

![]()
Breaking out an opening for new staircase onto floor using a brokk 90 at B&Q Warehouse, Newcastle-upon-Tyne. Once the diamond cutting of a perimeter had been completed, we worked out of hours as the store was trading during the day.

![]()
Wire saw set up and ready to start cutting concrete 1300mm deep with heavy reinforcement approx 16 metres. We completed this work within 4 days.

![]()
Diamond hand drilling 100mm diameter holes within concrete panels for lifting points.

![]()
Diamond drilling through ring beams on a new housing development.

![]()
Diamond hand/ring sawing concrete panels 200mm deep.

+44 (0)24 7639 8518